Its designed for small plaza (strip mall). all drawing made by engineers and all approval is taken from state and county to start the construction. took over a year to draw and take the approvals and cost a lot. Its located on the border of city limit and with an annexation easily can be attached to city limit if you want to or can stay with county with less regulations.
Copyright © 2024 ValleyMLS.Com,Inc. All rights reserved. All information provided by the listing agent/broker is deemed reliable but is not guaranteed and should be independently verified.