Amazing investment opportunity with all of the hard work already completed! The Seller will provide the suggested plans for 9 Townhomes, 4 in the front half of the lot and 5 in the back half of the lot. The grading is mostly complete, as the lot is filled to elevate the townhomes and a slope is already in place for the water to drain into the sewer, which is already connected to the public line. There is also a retention pond in place with an overflow retention area as well! The builder has set this project up for success by completing all of the underground piping, including the water lines AND lift station for sewage. All that is left to complete is the final grading and the building of the Townhomes.
Copyright © 2025 Stellar MLS. All rights reserved. All information provided by the listing agent/broker is deemed reliable but is not guaranteed and should be independently verified.