Building area of lot has been cleared and ready for building. All stumps were removed and 149 loads of shale and dirt were hauled in to level building area. Driveway area was undercut 3' to create a stable base. Perc test completed and septic system for 5 bedroom plan designed and approved by Health Dept.
Copyright © 2024 Cooperative Arkansas Realtors Multiple Listing Service. All rights reserved. All information provided by the listing agent/broker is deemed reliable but is not guaranteed and should be independently verified.